Asphalt Driveway PavingPlacitas · Bernalillo · Turquoise Trail
Call or text(505) 337-3833Call now

Paving once isn't the end of it

Every road wears. The difference between a road that lasts 25 years and one that's broken in 10 is usually maintenance — sealing cracks before water gets in, fixing small failures before they spread, and keeping ditches and culverts clear so storm water goes where it should.

What a plan covers

Every year

Walk the road after monsoon season. Seal new cracks, patch small failures, clear culverts and ditches, reset rock at outlets.

Every few years

Sealcoat asphalt sections; renew chip seal where stone has worn thin; regrade shoulders.

Longer term

Overlay asphalt sections as they age; plan larger culvert or crossing upgrades.

Paperwork

A written condition report and cost forecast your board can use for budgeting and dues.

Hot-pour crack sealant applied with a wand into a crack in asphalt
Sealing a cleaned crack with hot-pour sealant.

How we start

  1. Road walk. We walk or drive the full road with a board member and note surface condition, cracks, failures, drainage and crossings.
  2. Condition report. Photos and a section-by-section summary.
  3. Multi-year budget. What to do this year, next year and in five years — with costs.
  4. Scheduled work. We do the work on the schedule you approve and update the report afterward.

Related: crack sealing, repairs, chip seal.

Questions & answers

Do you work with small associations?

Yes — from a few homes sharing a lane to larger subdivisions.

Can you present to our board?

Yes. We provide a written report and can walk the road with board members.

How often should a road be crack-sealed?

Inspect yearly; seal new cracks as they appear — usually a small job each year.

Keep reading

Let's look at your driveway

Free on-site estimates in Placitas and nearby. Call or text (505) 337-3833.